Kitchen and Bathroom Remodeling in Chevy Chase, MD

Chevy Chase is seven towns, villages and sections plus the land between them, each with its own rules. We file the County and WSSC permits, check what your municipality asks for, and design every room with you. Our Bethesda showroom is less than a mile away in a straight line.

Kitchen · Chevy Chase, MD

3 Chevy Chase homes served since 2015

Be Chevy Chase home #4

Request a free in-home consultation →

Get a free in-home consultation

Step 1 of 2 · 20 seconds
What are you remodeling? Pick all that apply

Sena K., sales director at Fairfax Kitchen and BathSena, our sales director, calls you back within 2 business hours.Sena K., sales director, with FKB since 2017. She listens, answers your questions and books your free in-home consultation. Not a call center.Meet the team →

Local facts

Chevy Chase at a glance: County permits, local rules and old houses

Chevy Chase, Maryland (20815), not the DC neighborhood of the same name. Nine things to know before a remodel here, each linked to the office that published it.

Building permits

Montgomery County DPS

No Chevy Chase municipality runs its own building-code office. The County lists interior alterations and electrical work as needing a permit; new cabinets and floor coverings do not.

DPS permit listChecked Nov 6, 2026

Plumbing and gas

WSSC Water

Most plumbing projects must be done by a WSSC-licensed plumber or gasfitter. WSSC's Licensing Office checks a license at 301-206-8588.

WSSC for homeownersChecked Nov 6, 2026

Local layer

7 municipalities

The Town of Chevy Chase, Chevy Chase Village, Sections 3 and 5, Martin's Additions, Chevy Chase View and North Chevy Chase each add rules, mostly for exteriors, dumpsters and trees.

Compare all seven ↓Checked Nov 6, 2026

Interior-only work

Usually no local permit

Four municipalities say so in writing: Chevy Chase Village, Section 5, Martin's Additions and North Chevy Chase. The other three don't list it, so we confirm.

Village guide North Chevy ChaseChecked Nov 6, 2026

Dumpsters

Off the street

Chevy Chase Village, Section 3, Section 5 and Chevy Chase View all keep dumpsters off their streets, and most municipalities want a permit first.

Section 3 Section 5Checked Nov 6, 2026

Historic district

327 properties

The Chevy Chase Village Historic District reviews exterior changes only: "Interior alterations, changes, etc. are not subject to review."

Montgomery PlanningChecked Nov 6, 2026

Homes

75.5% owner-occupied

The unincorporated Chevy Chase census area had 10,176 residents and 4,282 housing units in the 2020 Census.

Maryland Dept. of PlanningChecked Nov 6, 2026

Housing stock

From 1892 to about 1930

Chevy Chase Village was planned and developed from 1892 to about 1930, with Colonial Revival, Neoclassical, Shingle, Tudor Revival, Italian Renaissance and Craftsman houses.

Montgomery PlanningChecked Nov 6, 2026

Nearest showroom

Bethesda, under a mile

Straight-line distance from central Chevy Chase to 4710 Bethesda Ave, Suite A, Bethesda, MD. Open Monday to Saturday, 9 am to 5 pm; Fairfax and Sterling welcome you too.

Bethesda directionsChecked Nov 6, 2026

Our work in Chevy Chase

One Chevy Chase home, two projects: first the kitchen, then the primary bath

Designer Sena planned both rooms with the homeowners, and our crew built them. Each story is told in full on its own page.

Kitchen remodeling in Chevy Chase, MD: a dark island with a white quartz top and farmhouse sink under two dark pendants, white cabinets to the ceiling with glass-front uppers, a white hood with blue zellige, a 48-inch range and a built-in refrigerator
Open kitchen · Chevy Chase, MD

The dining room wall came out

The old all-white kitchen sat behind a tiled wall with a doorway to the dining room. We checked what the wall carried; it was not a bearing wall, so it came out without a beam. Now St. Martin cabinets in white run to the ceiling, a dark Peppercorn island holds the farmhouse sink, the dishwasher and a microwave drawer, and blue zellige climbs to a white hood our crew built, with new ducting and make-up air.

Read the Chevy Chase kitchen story →
Primary bathroom remodeling in Chevy Chase, MD: a wood double vanity with a slab top and brass faucets under a brass mirror and sconce, a walk-in shower in white slab panels behind frameless glass, a white freestanding tub and a marble basketweave floor
Primary bath · Chevy Chase, MD

Then they came back for the primary bath

Sena was drawing this bath before the kitchen was finished. A wall-hung sink and a curtained shower stall gave way to a walk-in shower lined floor to ceiling in Dekton slab panels behind frameless glass, a 67-inch double-ended freestanding tub beside it, an oak double vanity with gold Kohler Artifacts faucets and a marble basketweave floor. The closet next door was rebuilt too.

Read the Chevy Chase primary bath story →

Permits and approvals

What your municipality asks for

The County and WSSC permits are the same everywhere in Chevy Chase. What changes from one street to the next is the town, village or section on top: interior work, dumpsters, work hours and trees.

Everywhere in Chevy Chase: Montgomery County and WSSC

  • Building and electrical: Montgomery County's Department of Permitting Services (DPS) issues them in every part of Chevy Chase. An interior alteration needs a permit; installing or replacing cabinets, floor coverings and bathroom caulking do not. Work that needs no permit must still meet the code. DPS permit list
  • Plumbing and gas: WSSC Water permits, through WSSC ePermitting, and in Montgomery County most plumbing must be done by a WSSC-licensed plumber or gasfitter. WSSC for homeowners
  • Order of inspections: DPS will not do its close-in inspection until WSSC has approved the rough-in plumbing; the master plumber of record schedules the WSSC inspections. DPS inspection guide
  • County fees: for alterations, $0.78 per square foot in the fiscal year that began July 1, 2026, plus a filing fee of half the permit fee or $329.59, whichever is greater. DPS fees, FY27
  • Where it happens: DPS's "Apply & ePay" portal, with plans uploaded through ePlans; the office is at 2425 Reedie Drive in Wheaton, 240-777-0311. DPS residential alterations Our permit department files the permits and books the County inspections.

Chevy Chase Village

5906 Connecticut Ave · 301-654-7300

No Village permit for interior-only work
Kitchen or bath inside
"The Village does not require a Village building permit if you are doing work only to the interior of your home," though other Village permits may still apply.
Dumpster or pod
Village permit, $30 for 90 days. "Dumpsters may never be located on Village streets." A portable storage unit is $30 for 30 days.
Work hours
Not in the Village guide; we check with the Village office.
Also
No Village permit is issued until every County permit is. Removing a tree over 24 inches around needs a permit, and permits must be posted where they can be seen from the street.

Village permitting guide (2022)Village permitsChecked Nov 6, 2026

Town of Chevy Chase

4301 Willow Lane · 301-654-7144

Interior work not on the list: we confirm
Kitchen or bath inside
A Town permit covers building, altering or demolishing, fences, driveways, pools and work in the right-of-way. Interior-only kitchens and baths are not listed, so we confirm with Town staff.
Dumpster or pod
A Town permit for any dumpster or portable storage unit, on public or private property. The Town's guide lists a $50 fee and a $500 bond.
Work hours
7 am to 7 pm on weekdays; 9 am to 7 pm on weekends and federal holidays (Town Code Sec. 16-1).
Also
A Tree Protection Plan is required if work could threaten a canopy tree.

Town land use guide (2019)Town permit applicationChecked Nov 6, 2026

Section 3 of the Village of Chevy Chase

permitting@chevychasesection3.org

Interior work not on the list: we confirm
Kitchen or bath inside
The Section's application lists new houses, additions, patios, driveways, fences, generators and AC compressors, and dumpsters. Interior-only work is not listed.
Dumpster or pod
Dumpsters and PODS are not allowed on the street; the spot on the lot must be approved. $50 plus an escrow, either a bond or a $1,500 check, and removal within 30 days.
Work hours
Not on the Section's permit pages; we ask the Section.
Also
The form asks for the County permit number, the contractor's signature and a foreman contact, and notice to adjoining and confronting neighbors. Permits last 12 months.

Section 3 applicationSection 3 dumpstersChecked Nov 6, 2026

Section 5 of the Village of Chevy Chase

301-986-5481

Interior work exempt
Kitchen or bath inside
Exempt: "interior construction, renovation, or repairs that make no alteration in the existing exterior three-dimensional boundaries of a structure" (Sec. 9-110, in effect since February 3, 2026).
Dumpster or pod
A permit for any dumpster or portable storage unit, on the lot or in the right-of-way, and none on Section 5 streets or sidewalks (Sec. 8-120).
Work hours
Section 5's noise rules adopt the Montgomery County Noise Control Ordinance.
Also
Removing a tree needs a permit from the Village Manager.

Section 5 ordinancesSection 5 permittingChecked Nov 6, 2026

Village of Martin’s Additions

7013 Brookville Rd, Suite B · 301-656-4112

Interior work is the County’s
Kitchen or bath inside
"Interior work is regulated by Montgomery County, not the Village." Exterior work needs a Village permit.
Dumpster or pod
Dumpsters need a Village permit, as does anything that blocks or alters streets, curbs or sidewalks.
Work hours
Not on the Village's permit page; we ask the Village manager.
Also
Where a Village permit is needed, its application is due within 3 days of applying for the County permit.

Martin’s Additions permitsChecked Nov 6, 2026

Town of Chevy Chase View

P.O. Box 136, Kensington · 301-949-9274

Interior work not on the list: we confirm
Kitchen or bath inside
The Town Council's written approval is needed before construction. Its permit list covers construction, demolition, additions, aprons and curb cuts, fences and pools; interior work is not listed.
Dumpster or pod
Never in the street or right-of-way, and plywood goes down before the dumpster is set. Construction vehicles may not park on Town streets overnight.
Work hours
Start no earlier than 7 am on weekdays and 9 am on weekends and holidays; noise stops at 9 pm.
Also
Projects of $10,000 or more post a $5,000 cash performance bond (smaller ones only if a dumpster or POD is used). Right-of-way trees are fenced at least 3 feet from the trunk.

Chevy Chase View proceduresBuilding and constructionChecked Nov 6, 2026

Village of North Chevy Chase

northchevychase.org

No Village permit for interior-only work
Kitchen or bath inside
"Building permits are not required for activities occurring entirely within the interior of a building."
Dumpster or pod
A Village permit covers where a dumpster or temporary storage unit is placed.
Work hours
Not on the Village's permit page; we ask the Village.
Also
Applications must arrive 7 days before a Council meeting. Residents check with the County whether a County permit is needed too.

North Chevy Chase permitsChecked Nov 6, 2026

Unincorporated Chevy Chase

Chevy Chase addresses outside the seven municipalities

County and WSSC
Kitchen or bath inside
The County DPS permit for an interior alteration, and WSSC for the plumbing. We know of no town or village layer here, and we confirm your address before anything is filed.
Dumpster or pod
We know of no municipal dumpster permit here; our container goes on your property, not the street.
Work hours
We know of no municipal hours here; we expect Montgomery County's noise rules to apply and confirm them.
Also
Everything in the box above still applies.

County permit listChecked Nov 6, 2026

Not sure which one you live in? Many Chevy Chase addresses look alike, so we check your address against the municipal lines at the first visit, before anything is drawn or filed. Remodeling permits in Montgomery County, DC and Northern Virginia →

Ask Sena what your municipality needs →

Kitchens in Chevy Chase

Kitchen remodeling in Chevy Chase: opening up an older house

Chevy Chase was developed as a planned streetcar suburb between 1892 and 1930, Chevy Chase Lake plan and in the Chevy Chase home in our story the kitchen sat behind a tiled wall, reached from the dining room through a doorway. Opening that wall was the heart of the plan. Before any wall comes down, we check what it carries; that one was not a bearing wall, so no beam was needed, and only the wiring inside it moved.

On the permit side, the County puts new cabinets on its no-permit list but an interior alteration on the permit side, and moving a sink into an island is WSSC plumbing work. DPS permit list A bigger hood can mean new ducting and make-up air, as it did in that kitchen. Your designer measures the room at home, then builds the plan in 3D at our Bethesda showroom, where you can open the drawers and hold the quartz and tile next to each other.

Cost: Kitchens from about $20,000. Most of our full kitchen remodels fall between $32,000 and $60,000+. A range is a starting point, not a quote.

Our kitchen remodeling service → · Kitchen remodeling cost guide →

Kitchen remodeling in Chevy Chase, MD, seen from the dining room side: a long dark island with a white quartz top under two dark pendants, white cabinets, the range and the refrigerator wall
The opened kitchen, from the dining room side · Chevy Chase, MD

Bathrooms in Chevy Chase

Bathroom remodeling in Chevy Chase: WSSC first, then the County

A Chevy Chase bath runs on two permits in a set order. The plumbing belongs to WSSC Water and a WSSC-licensed plumber, and the County's DPS will not close the walls with its close-in inspection until WSSC has passed the rough-in plumbing. DPS inspection guide WSSC

In the Chevy Chase primary bath we built, the walls came open to the masonry, the old drain and supply pipes were replaced, and a heating duct was moved so the freestanding tub could sit where it was planned. Full-height Dekton slab panels, set by our crew one at a time, left the shower with very few joints.

Cost: Bathrooms from about $12,500. Most of our bathrooms fall between $20,000 and $60,000+. A range is a starting point, not a quote.

Also in Chevy Chase: tub-to-shower conversions (shower remodeling cost), finished basements (basement remodeling cost), custom closets and whole-home remodels.

Our bathroom remodeling service → · Bathroom remodeling cost guide →

Primary bathroom remodeling in Chevy Chase, MD, seen from inside the shower: the slab half wall with its niche, a white double-ended freestanding tub with a gold deck-mounted filler on a slab ledge, green-gray paneled walls and the wood vanity with a brass mirror
The tub beside the slab shower · Chevy Chase, MD

Historic districts

Remodeling inside a Chevy Chase historic district

The Chevy Chase Village Historic District covers 327 properties, from Chevy Chase Circle north to the south side of Bradley Lane, between Brookville Road and Cedar Parkway. Its period of significance starts in 1892, and its houses run from Colonial Revival and Shingle to Tudor Revival, Italian Renaissance and Craftsman. For a kitchen or bath, the key line is plain: "Interior alterations, changes, etc. are not subject to review under the Historic Preservation Ordinance." Montgomery Planning

  • Exterior changes: additions, porch enclosures, new exterior materials, window sash, removing shutters or painting masonry need a Historic Area Work Permit, filed through DPS. Interior work is on Montgomery Planning's list of changes that do not involve the Historic Preservation Commission. Historic Area Work Permits
  • In the Village: when a historic permit is needed, the Village issues its own permit only after it. Village permitting guide
  • Hawkins Lane: a smaller historic district off Jones Bridge Road near Connecticut Avenue, a Black kinship community founded by James H. Hawkins, who bought 3 acres in 1893; it has 15 houses, and its guidelines say historic permits are not needed for interior work. Hawkins Lane guidelines

So a remodel that stays inside the walls goes through the County permit like anywhere else. A new window, a bump-out or an addition is where historic review starts, and we look up your address before the design does.

Primary bathroom in Chevy Chase, MD: green-gray walls with picture-frame paneling and crown molding, a white six-panel door, the slab knee wall with its niche at the foot of the tub and the end of the wood vanity
Paneling, crown and a six-panel door · Chevy Chase, MD

Our work near Chevy Chase

Close by in Silver Spring and Washington, DC

Beyond the Chevy Chase home, these are the nearest jobs we have written up. Each is told in full on its own page.

Primary bathroom remodeling in Silver Spring, MD: a white freestanding tub in front of a sand shaker double vanity with a white quartz top, black-frame mirrors and glass sconces, and a walk-in shower with marble-look walls at the back
Primary bath · Silver Spring, MD

A Silver Spring primary bath

The half wall came out, and a walk-in shower in marble-look porcelain with a black hex floor now stands beside a freestanding tub under two skylights, with a long double vanity across the room.

Read the Silver Spring bath story →
Hall bathroom remodeling in Washington, DC: a maple vanity with brass sconces beside a tub in white herringbone tile
Hall bath · Washington, DC

A rowhouse hall bath in DC

In a Foxhall Village rowhouse, the hallway linen closet joined the bath as a tall maple tower, a heated floor replaced the steam radiator, and white herringbone tile runs to the ceiling over a black hex floor.

Read the DC hall bath story →
Condo kitchen remodeling in Washington, DC: a galley seen from the doorway, with white Shaker cabinets on both sides, light gray quartz, an undermount sink under the window and the edge of a turquoise refrigerator
Condo galley kitchen · Washington, DC

A condo galley kitchen in DC

The same galley, all new: white Shaker cabinets, light gray quartz, a stacked 5x5 backsplash and a soffit rebuilt around a concrete beam, with the homeowner's turquoise retro fridge as the one color.

Read the DC condo kitchen story →

Your old kitchen

Where old Chevy Chase cabinets, fixtures and debris can go

  • Habitat ReStore, Rockville: Habitat for Humanity Metro Maryland's store at 1029 East Gude Drive, (301) 947-3304, takes building materials, appliances, cabinets, windows and plumbing fixtures, with pickup for large items. Open Tuesday to Saturday 10 to 5 and Sunday 11 to 5, per its 211 Maryland listing. 211 Maryland listing
  • Community Forklift, Edmonston: a reuse warehouse that takes cabinets with their doors attached and no grease, mold or water damage, vanities whose top comes with its base, kitchen sinks and low-flow toilets. Donation guidelines
  • "Don't Dump. Donate!" at the County's Shady Grove Transfer Station takes usable building materials for reuse. The County also requires construction and demolition projects to separate cardboard and scrap metal for recycling. County DEP
  • New Shady Grove limits: from October 2026 the Transfer Station takes construction and demolition loads only under two tons, County release and from November 2, 2026 none that arrive in open-top containers, roll-offs, box trucks or trailers with two or more axles. County DEP
  • Not at the curb: the Town of Chevy Chase's twice-yearly "Trash & Treasures" pickup excludes construction debris, Town trash and recycling and Chevy Chase View's monthly bulk pickup takes no drywall, lumber, concrete or brick. Chevy Chase View bulk pickup
  • Keeping cabinets for reuse: say so at the final measurement. Our crew takes them out whole on demo day, and they need a dry spot to wait for the pickup, which you book with the charity. Everything else from demolition leaves with us, and before demo day we check where your municipality allows our container.

Check any contractor

Before you hire a remodeler in Chevy Chase

Maryland's Home Improvement Commission sets the rules for your contract: it must be written and signed, with the contractor's name, address and MHIC license number, start and completion dates, and a description of the work and materials. "A contractor cannot accept more than 1/3 of the contract price as a deposit," and when payment is secured by your home, you have 3 business days to rescind. MHIC contracts The Commission also says that if a building permit is needed, ask to see it before work starts. MHIC consumer advice

The MHIC Guaranty Fund can pay up to $30,000 per claimant, but not if you hired an unlicensed contractor. Guaranty Fund FAQ Montgomery County's Office of Consumer Protection is at 240-777-3636, and one of its investigators advises getting several quotes, putting every change in writing, and remembering that a County inspection checks the code, not the quality of the work. OCP podcast, May 2026

Our Maryland license is MHIC #110852. Check it with Maryland. We also hold Virginia DPOR Class A #2705163164 (check it) and Washington, DC DLCP #410526031952 (check it). For plumbing, ask for the plumber's WSSC license number; WSSC's Licensing Office checks it at 301-206-8588. Our guide to choosing a remodeling contractor →

How we work

Three phases, from the first visit to the County final inspection

Design first, then ordering and the County, WSSC and municipal paperwork, then the build, with one project manager on site.

Phase 1

Plan and design

Leads: Sena, then your designer
  • First call with Sena, our sales director
  • Free in-home consultation and measurements
  • 3D design on the showroom screen; change it until it is yours
  • Material selections and your proposal
  • Contract, then the hand-off meeting: final measurement with your designer and project manager

Phase 2

Order and permits

Leads: Our operations manager and permit department
  • Every material ordered and received in our warehouse
  • We handle every permit and inspection
  • Start date set by your designer, project manager, operations manager and Sena
  • Your job-start email and preparation checklist

Phase 3

Build

Leads: Your project manager and lead technician
  • Demo day: our container arrives, the permit goes on the door
  • Inspections scheduled by our team; we meet the inspector
  • Countertop and glass partners measure; you approve their drawings
  • Final walkthrough with your project manager; two-year warranty starts

Our remodeling process, step by step →

Book a free design consultation in Chevy Chase →

Reviews

Our Bethesda showroom on Google

The showroom less than a mile from Chevy Chase, where Montgomery County and DC homeowners meet their designer.

★ 5.0 on Google from 25 reviews. Read the Bethesda showroom reviews on Google → · All our reviews →

Questions

Chevy Chase remodeling questions

Do I need a permit to remodel a kitchen or bathroom in Chevy Chase?

Almost always, from Montgomery County. Its Department of Permitting Services lists interior alterations and electrical work as needing a permit and sends plumbing to WSSC Water; new cabinets, floor coverings and replacing an outlet in the same spot are on its no-permit list. That is the same everywhere in Chevy Chase. On top of it, each town, village and section has its own rules, mostly for exterior work, dumpsters and trees. Our permit department files the County and WSSC permits and books the County inspections; the WSSC inspections are scheduled by the licensed master plumber of record.

Does my town or village have to approve an interior remodel?

In most of Chevy Chase, no. Chevy Chase Village, Section 5, Martin's Additions and North Chevy Chase each say in writing that work only inside the house needs no local building permit. The Town of Chevy Chase, Section 3 and Chevy Chase View do not list interior-only work on their permit forms, so we confirm with their staff before we start. Every one of them still has rules for dumpsters and storage units.

Where can the dumpster go during a Chevy Chase remodel?

Usually on your own driveway. Chevy Chase Village, Section 3, Section 5 and Chevy Chase View all keep dumpsters off their streets, and most municipalities ask for a permit first: $30 for 90 days in the Village, $50 plus an escrow (a bond or a $1,500 check) in Section 3, and a $50 fee with a $500 bond in the Town of Chevy Chase, per its guide. We check where your municipality allows our container before demo day.

My house is in the Chevy Chase Village Historic District. Does that affect a kitchen or bath?

Not the inside. Montgomery Planning's amendment for the district says interior alterations are not subject to review under the Historic Preservation Ordinance, and a Historic Area Work Permit is for exterior changes such as additions, porch enclosures, window sash or new exterior materials. A kitchen or bath that stays inside the walls goes through the County permit like any other. If the plan changes the outside, the Village waits for that historic permit before it issues its own.

How much does a kitchen or bathroom remodel cost in Chevy Chase?

Kitchens from about $20,000. Most of our full kitchen remodels fall between $32,000 and $60,000+. Bathrooms from about $12,500. Most of our bathrooms fall between $20,000 and $60,000+. A range is a starting point, not a quote. The size of the room, the layout and your selections set your own number, and a designer prices your plan after measuring your home.

Which of your showrooms is closest to Chevy Chase?

Bethesda. Our showroom at 4710 Bethesda Ave, Suite A, Bethesda, MD is less than a mile from central Chevy Chase in a straight line, and it is open Monday to Saturday, 9 am to 5 pm. You are welcome at our Fairfax and Sterling showrooms too, and a designer can meet you at any of the three.

Where can old cabinets and fixtures go after a Chevy Chase remodel?

Two reuse options are close. Habitat for Humanity Metro Maryland's ReStore at 1029 East Gude Drive in Rockville takes building materials, appliances, cabinets, windows and plumbing fixtures, with pickup for large items. Community Forklift in Edmonston takes cabinets with their doors attached. The Town of Chevy Chase and Chevy Chase View curbside pickups take no construction debris, so everything else from demolition leaves with our crew.

Homes served in towns near Chevy Chase

Every town and city we serve →

Planning a kitchen or bath in your Chevy Chase home?

Fill in the form near the top of this page or call (301) 409-4480. Sena calls you back, and a designer comes to your home to measure, talk through ideas and check what your town, village or section will ask for, free. Our Bethesda showroom is less than a mile away in a straight line; you can also meet a designer in Fairfax or Sterling.